21Special Express10 min lateNortheastern Line

Where is train 21 now?

Bangkok (Krung Thep Aphiwat) → Ubon Ratchathani

Now: running between Ayutthaya → Saraburi, 10 min late, expected at Saraburi at 07:43

Last updated (Bangkok time) · 23 Nov 2026

Latest status

Status
Running
Punctuality
10 min late
Last report
Left Ayutthaya 07:10
Next station
Saraburi · 07:43
Origin
Bangkok (Krung Thep Aphiwat)
Destination
Ubon Ratchathani
Service date
23 Nov 2026
Reported at
23 Nov 2026 07:10 (Bangkok time)

Train 21 timetable

Scheduled timetable recorded on 22 Nov 2026 (may change — check with SRT). Estimates use SRT times first; otherwise ≈ scheduled time plus current delay. Times are Bangkok time.

StationArr.Dep.Estimate
Bangkok (Krung Thep Aphiwat)–06:10
Don Mueang06:2506:27
Rangsit06:3606:37
Ayutthaya06:5806:59
Map Phra Chan07:0607:06≈ 07:16Today
Saraburi07:3307:3407:43Today
Kaeng Khoi Junction07:4407:45≈ 07:54Today
Pak Chong08:4308:44≈ 08:53Today
Nakhon Ratchasima10:0110:11≈ 10:11Today
Thanon Chira Junction10:1710:18≈ 10:27Today
Lam Plai Mat11:1311:14≈ 11:23Today
Buri Ram11:3411:37≈ 11:44Today
Krasang11:5311:54≈ 12:03Today
Surin12:0912:11≈ 12:19Today
Sikhoraphum12:3212:33≈ 12:42Today
Uthumphon Phisai13:0113:02≈ 13:11Today
Si Sa Ket13:1813:20≈ 13:28Today
Kanthararom13:3813:39≈ 13:48Today
Ubon Ratchathani14:00–≈ 14:10Today

Q&A

Where is train 21 now?

As of 07:17 Bangkok time: running between Ayutthaya → Saraburi, 10 min late, expected at Saraburi at 07:43.

How late is train 21?

Latest report: 10 min behind schedule.

What time does train 21 arrive in Ubon Ratchathani?

Scheduled arrival in Ubon Ratchathani: 14:00 (Bangkok time). ≈ Timetable plus current delay: 14:10 Today.

How accurate is this position?

Positions are estimated from the times stations report (arrive / depart / pass), not GPS. Between stations it is an estimate that is corrected as soon as the next station reports.

Other trains running on the Northeastern Line

Origin / destination stations