928Excursion Pasak Chonlasit DamNortheastern Line

Where is train 928 now?

Pa Sak Jolasid Dam → Bangkok (Hua Lamphong)

Now: no trip of train 928 is running in the system — it may not have left its origin yet, or it has already arrived (last seen 22 Nov 2026 21:49).

Last updated (Bangkok time) · 23 Nov 2026

Train 928 timetable

Scheduled timetable recorded on 21 Nov 2026 (may change — check with SRT). Estimates use SRT times first; otherwise ≈ scheduled time plus current delay. Times are Bangkok time.

StationArr.Dep.Estimate
Khok Salung–10:00
Pa Sak Jolasid Dam15:2015:30
Kaeng Sue Ten15:3615:37
Kaeng Khoi Junction16:1116:14
Saraburi16:2716:28
Ayutthaya17:0817:09
Rangsit17:4817:51
Don Mueang18:0218:03
Bang Sue Junction18:2818:29
Bangkok (Hua Lamphong)18:50–

Q&A

What time does train 928 arrive in Bangkok (Hua Lamphong)?

Scheduled arrival in Bangkok (Hua Lamphong): 18:50 (Bangkok time).

How accurate is this position?

Positions are estimated from the times stations report (arrive / depart / pass), not GPS. Between stations it is an estimate that is corrected as soon as the next station reports.

Other trains running on the Northeastern Line

Origin / destination stations