930Excursion Royal BlossomNortheastern Line

Where is train 930 now?

Khok Salung → Bangkok (Hua Lamphong)

Now: no trip of train 930 is running in the system — it may not have left its origin yet, or it has already arrived (last seen 22 Nov 2026 23:49).

Last updated (Bangkok time) · 23 Nov 2026

Train 930 timetable

Scheduled timetable recorded on 22 Nov 2026 (may change — check with SRT). Estimates use SRT times first; otherwise ≈ scheduled time plus current delay. Times are Bangkok time.

StationArr.Dep.Estimate
Khok Salung–17:10
Ayutthaya19:1319:14
Rangsit19:4919:52
Don Mueang20:0220:03
Bang Sue Junction20:2820:30
Bangkok (Hua Lamphong)20:50–

Q&A

What time does train 930 arrive in Bangkok (Hua Lamphong)?

Scheduled arrival in Bangkok (Hua Lamphong): 20:50 (Bangkok time).

How accurate is this position?

Positions are estimated from the times stations report (arrive / depart / pass), not GPS. Between stations it is an estimate that is corrected as soon as the next station reports.

Other trains running on the Northeastern Line

Origin / destination stations